The Client

Shangri-La Hotels Group
(Stellar Properties – Developer)

Architect

Steve Leung Architects
(Renzo Piano – concept)

Main Contractor

John Sisk & Son Ltd
(Mace Ltd – Base Build)

Product

Liquid anhydrite (calcium sulphite) levelling screed. Liquid cementitious levelling screed and Isocrete K screed – all laid on a rubber-based resilient layer.

Floor Area

Floors 16,000m² to various areas within the hotel demise which included from Level 34-52.